10 Steps to Prepare Your Facility for Heavy Storms

Sponsored Content provided by Rick Jones - Service Department Manager, Highland Roofing Company

It’s never too early to think about preparing your facility for heavy storms – especially now that our region is in the heart of hurricane season. 

 

Following is a 10-step action plan to ensure that your facility is ready for heavy storms.

  1. 1. Be sure to check that your roof, gutters and roof drains are clear of items that could damage the roof or block the flow of water rapidly draining off the building.  
    2. Be sure the roof vent covers are in place and firmly affixed.  Fasten down any loose/damaged parapet covers.  
    3. Conduct a walk-through looking at the ceilings in the building - note existing stained areas, so they can be checked for new leaks and compared to stains that are visible after the storm.  
    4. Be sure windows are properly closed and drip caps in position over exposed doors. 
    5. Install plastic and other safety items where heavy rains tend to back up into the facility.  
    6. Be sure that site drains outside the building are all free of debris and ready for operation.  
    7. Go around the building and fasten any loose siding elements. 
    8. Take loose site decorations and site furniture indoors or gather it and use chains or cables to bind the items together and fasten them to something solid.  
    9. Remove loose hanging dead limbs around the building (live limbs that can touch the building should be trimmed away in late winter every year.)
    10. Schedule quarterly Disaster Preparedness & Contingency Planning - DPCP exercises. This should involve your staff and vendors who should be on a prearranged list of vetted partners who you would be contacting for/during an emergency event. This helps prepare all individuals that would be involved from all ends, from the vendors to your building personnel and/or clients, to experience what actually happens or cold happen during an emergency situation.
  2.  

Most commercial roofing companies offer maintenance programs that address most of the items above and ensure your building’s roof will weather future storms.

 

Preventative roof maintenance programs include making minor repairs to protect building owners from interior damages caused by water intrusion, help prevent costly repairs down the road and extend the life of the roof system.  

 

The frequency is either quarterly, semi-annual or annual depending on the size of one’s business and if there are circumstances such as a lot of trees that have higher debris potential that require more frequent maintenance visits.
 

Join The Discussion

Ico insights

INSIGHTS

SPONSORS' CONTENT
Ico insights

INSIGHTS

SPONSORS' CONTENT

In The Current Issue

Endless opportunities: GFBJ examines mentorship programs offered by institutions of higher learning throughout our seven county coverage area

For many young professionals, their future begins with a foot in the door. Mentorships, apprenticeships and working one on one to learn an industry can be enough to spark an entire career. Institutions of higher learning throughout the Greater Fayett


Engineering a workforce: FTCC provides a wide variety of career-focused programs for high-demand skills in engineering & applied technology fields

FTCC’s Engineering and Applied Technology academic programs range from expected offerings like a vast air conditioning, heating and refrigeration technology program, to a recently devised curriculum in the Mechatronics Engineering program. Photo prov


Feeding passion: The story of downtown restaurant Circa 1800 and the devoted individuals leading it along the way

Brandy Puczylowski became the owner of Circa 1800 in January of 2013. She has over 30 years of experience working in the restaurant industry. Photo provided by Circa 1800Popular downtown Fayetteville eatery Circa 1800 has been serving the commun