More News

Cumberland County road requires lane closures for work on I-295

By Staff Report, posted 3 years ago
Photo courtesy of NCDOT

Drivers should expect delays for the next several months on Camden Road where construction on Interstate 295 has begun.

A contractor for the N.C. Department of Transportation is building an interchange with a bridge and ramps that will carry Camden Road over I-295 near Farm Circle Road and southwest of Jack Britt High School.

The contractor needs to close one of the two lanes to do construction, such as grading dirt and installing drainage pipes, near the edge of Camden Road. These periodic lane closures will be limited to weekdays from 8 a.m. until 4 p.m. They began Monday, Feb. 20 and are expected to be needed through June.

The lane closures will be conducted using automated flaggers with a red and yellow light under the supervision of an on-site operator, who will monitor the congestion. The contractor may not need to close a lane each day.

In addition, the I-295 construction requires large dump trucks and bed scrapers, which scoop up dirt, to be hauled from one side of Camden Road to another. This will necessitate very brief closures of Camden Road in both directions to allow the heavy equipment to cross.

Drivers should slow down, approach this location cautiously and be alert for workers.

Construction on this 5-mile segment, which runs from Camden Road to Raeford Road, is expected to be completed by summer 2026.

For real-time travel information, visit DriveNC.gov or follow NCDOT on social media.

Ico insights

INSIGHTS

SPONSORS' CONTENT
systel-business-equipment madison-spangler headshott

What a Hospital TV Show Taught Me About the Technology We Never Think About

Madison Spangler - Digital Marketing & Campaigns Coordinator, Systel Business Equipment
cape-fear-valley-health john-bigger headshott

Putting mental health first: Inside Cape Fear Valley Health’s behavioral health system

John Bigger - Corporate Director of Behavioral Health, Sleep Medicine and Clinical Research, Cape Fear Valley Health
fayetteville-state-university scott-krawczyk-phd headshott

How Fayetteville State University continues to evolve to make sure its students are competitive upon graduation

Scott Krawczyk, Ph.D. - Provost and Vice Chancellor for Academic Affairs, Fayetteville State University

In The Current Issue

Multi-generational business expertise: How legacies in local businesses find sustained success

Join us Sept. 29 for our third Power Breakfast of 2026 as business leaders share how they leverage decades of institutional wisdom. The Greater Fayetteville Business Journal invites you to join us for our third quarterly Power Breakfast, The Fam


Local expertise: Critical Path Solutions LLC chosen as construction company for Skyeton Manufacturing renovations

Skyeton leadership have decided to look locally for a general contractor to head up major renovations for the 28,479-square-foot building they’ve selected as their new home. Fayetteville-based Critical Path Solutions LLC has been chosen as the primary contractor for bringing new life to the previous Black+Decker plant site.


Fort Bragg goes nuclear: Antares awarded Army Janus Program agreement to deliver nuclear microreactor power for Army’s energy resilience mission

From left to right: US Secretary of Energy Chris Wright with Antares Co-founder and CEO Jordan Bramble. Photos courtesy of Antares Nuclear, Inc. Antares Nuclear, Inc. recently announced that it has been awarded an Other Transactions Authority ag